On-site and in-yard services for stripping press brakes, stamping presses, extruders and other oversized machinery down to clean, recyclable scrap.
Feedback from factory supervisors, maintenance leads and site engineers who booked our dismantling crews across Australia.
Workshop capabilities
Every workshop engagement is built around the same core promise: heavy wrecks leave your site in pieces, and we handle the cutting, lifting, and hauling so your production line stays clear. Here is what that means in practice.
When a machine is too large for a single crane lift, we section it in place. Our crew runs plasma cutters along structural beams and weld seams, reducing a 40-ton frame into manageable segments that clear doorways and overhead obstructions without disturbing adjacent equipment.
Factory floors rarely offer straight-line access. We use hydraulic jacks and skid systems to inch heavy components sideways, over cable trenches, and around support columns. This keeps the removal path controlled and protects the concrete slab from point-load damage.
Hydraulic oil, coolant, and fuel residues are drained and containerized before any torch touches metal. This step prevents contamination of your floor drains and keeps the scrap stream clean for the recycler, so you are not left with a hazardous waste problem after we leave.
Each lift is planned around the actual weight and center of gravity of the wreck, not a guess. We bring load-rated slings, spreader bars, and certified crane operators who know how to swing a 30-ton gearbox over a live production aisle without stopping your other lines.
Ferrous and non-ferrous metals are sorted at the point of removal, so the truck that leaves your yard carries clean, recyclable material. We handle the loading, transport, and delivery to licensed scrap processors, giving you a documented chain of custody for the whole load.
Once the wreck is loaded, we sweep the floor, patch anchor bolt holes, and remove debris so the bay is ready for the next machine. You get a clear, level surface and a short report of what was removed and where the material went. See how we run a full project from first call to final sweep on the offerings page.
We walk the factory floor with your maintenance lead, measure the wreck, check overhead clearance, and map every hydraulic line, electrical feed and anchor bolt before anything is cut.
Certified technicians isolate power, drain residual oil and coolant into sealed drums, and tag out pneumatic systems. Nothing leaves the building until the machine is inert and safe to touch.
Plasma cutters split the frame into liftable sections while crane riggers balance each load. We cut in the order that keeps the structure stable, never dropping weight onto the floor slab.
Each section is lifted clear, swung over the loading lane, and set onto flatbeds with timber dunnage. We work to your production schedule so the bay is only blocked for the hours agreed.
Steel grades are separated on site, ferrous scrap is weighed for the recycling manifest, and the floor is swept of cutting debris. You get a clearance certificate and a clean bay ready for the next machine.