What Changes After a Factory Floor Is Cleared

See how dismantled wrecks and scrap metal removal open up floor space, remove safety hazards, and return your plant to productive operation.

Factory floor cleared in days, not weeks

We cut, lift, and haul away the wreck in scheduled shifts, so your production lines get their space back without a long shutdown window.

No hidden contamination left behind

Hydraulic oil, coolants, and residual fuels are drained and disposed of properly. You get a clean slab, not a liability for the next tenant or auditor.

Scrap metal weighed and documented

Every load is logged with weights and destination certificates, giving your procurement team a clear paper trail for compliance and insurance records.

Rigging plans built around your building

Low ceilings, narrow doorways, and load-rated floors are mapped before we start. We bring the right cranes and rollers, so nothing structural gets damaged.

40+tonne wrecks dismantled on site
3days average turnaround for a full press line
100%of hydraulic fluids drained before cutting
0structural repairs needed after removal

Factory floor cleared, wreck removed, scrap metal on its way to recycling.

Ready to clear your factory floor?

Tell us about the machinery you need dismantled. We handle the rest — from the first cut to the final load out.

Request a site assessment
Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.