Service Formats for Factory Floor Clearance

Dismantling packages built around wreck size, site access, and how fast your production line needs the floor back.

Dismantling programs for factory floor clearance

Choose the right removal scope for your site

Every factory floor has a different mix of wrecked presses, dead conveyors, and rusted structural steel. These three scopes cover the common situations we walk into across Australian industrial sites. Pick the one that matches what is sitting on your floor, and we will handle the rest.

Single-Wreck Removal

One large machine, one clear job. We disconnect utilities, torch through the frame where needed, and lift the wreck out with a crane rated for its weight. The floor is swept and the scrap is loaded onto our trucks the same day. Best for a press, a boiler, or a generator that has reached the end of its service life.

See how a single removal runs

Production Line Strip-Out

A full line of interconnected machinery, often with conveyors, control cabinets, and overhead rails. We map the sequence before cutting anything so the structure stays stable while each section is lifted away. Hydraulic fluid and wiring are drained first, then the steel is cut into crane-ready pieces and hauled off for recycling.

Review the strip-out sequence

Whole-Floor Clearance

When a plant is closing, relocating, or being repurposed, we clear the entire floor down to bare concrete. That includes embedded anchors, floor-mounted rails, and the scrap piles left behind by earlier work. We coordinate with your site manager on access windows and keep the floor usable for other contractors until the day we move in.

Plan a full-floor clearance

Scrap Metal Buyback Haul

If the machinery is already dismantled but the scrap is piled up and blocking floor space, we bring in the magnet truck and haul it out by the tonne. We sort ferrous from non-ferrous on site, weigh each load, and issue a docket so your records match what left the building.

Book a scrap haul pickup

From Factory Floor to Clear Site

Every dismantling job follows the same disciplined path. We assess the wreck, cut it down, lift it out, and leave your floor ready for the next production line.

01

Site Survey

We walk the floor, map the machine's footprint, check load paths, and flag hydraulic oil, wiring, or structural tie-downs before anything moves.

02

Utility Isolation

Power, air, coolant, and gas lines get locked out and tagged. Our team confirms zero energy before a single bolt turns.

03

Cutting & Rigging

Plasma cutters split heavy sections into crane-ready pieces. Rigging points are welded or bolted on so lifts stay balanced and controlled.

04

Lifting & Hauling

Hydraulic jacks and overhead cranes move each section onto flatbeds. We coordinate with your shift schedule to keep production moving.

05

Scrap Recovery

Steel, copper, and aluminum are sorted on-site and trucked to licensed recyclers. You get a clean floor and a documented disposal trail.

Why factories choose us for heavy wreck removal

We cut, lift, and haul out machinery that has sat dead on your floor for years. No subcontractors, no middlemen, no half-finished jobs.

One crew from first cut to final sweep

Every wreck is assessed before we touch it. Hydraulic fluid, buried wiring, stressed steel — we map the hazards and plan the sequence before the first torch is lit.

Site survey before any cutting begins

Your production line does not stop because we are working. We schedule around shifts, keep noise and dust contained, and clear each bay before we leave.

Minimal disruption to running operations

Steel, copper, and alloys go straight to licensed recyclers. We document the chain so your environmental compliance record stays clean.

Documented scrap routing for compliance

Concrete pads, anchor bolts, and buried foundations are broken out and leveled. You get a clean slab ready for the next machine or a fresh layout.

Floor restoration down to bare concrete

Every dismantling job is scoped around your floor plan, your schedule, and the actual condition of the wreck. If you want to see how a typical removal runs, read our step-by-step breakdown of a 40-ton press brake pullout. Otherwise, call us at 8704-8151 and we will walk your site within the week.